· News
PTBA Aimed Banko Tengah Power Plant Operated in 2019

PT Bukit Asam Tbk (PTBA) aimed for its 2 x 620 Mega Watts capacity Banko Tengah power plants (worth of 1.59 billion US dollars) begin its operations in 2019 and supply its 5.4 million tons per year coal as fuels for 25 years as reported by Investor Daily.
Currently, PTBA operated 266 Mega Watts Banjarsari power plant and became fuel supplier of 1.5 million tons coal per year for 30 years. Meanwhile, the 800-1200 Mega Watts power plant inside its production area in Indragiri Hulu, Riau has completed the feasibility study.
Despite of its net profit 5% decrease (1.5 trillion rupiah), PTBA recorded 10,5 trillion rupiah for its 2015 Q3 revenues, or 9% increased. The increase was from coal sales volume increase to 14.35 million tons.
