· Press Release
PTBA hand over Tirta Bukit Asam Enim Swimming Pool to District Government Muara Enim

PT Bukit Asam (Persero) Tbk. or PTBA hand over Bukit Tirta Asam Enim Swimming Pool, a national standard swimming pool to the District Government of Muara Enim. With its own 50-meter long and 25 meters wide to 8 line swimming pool for a competition category, Muara Enim already has the facility to organize nationwide match events.
The signing of the Official Report of Tirta Enim Bukit Asam Swimming Pool is located in Muara Enim Sport center with the Rp 18,7 billion construction costs and the funding source from the PTBA Corporate Social Responsibility (CSR), held between Director of Bukit Asam, ArviyanArifin with Regent (Bupati) Muara Enim, Muzakir Sai Sohar in Muara Enim, in front of the pool, Friday, March 10, 2017.
PTBA Managing Director, Ir. Arviyan Arifin hoped that Tirta Enim Bukit Asam Swimming Pool may be "kawah candra dimuka" for athletes training center in the region, especially in Muara Enim that in the future, athletes able to perform as national athletes into international athletes. "This is the evidence of PTBA concern and contribution to develop society Muara Enim. Hopefully the existence of this pool can bring benefits and blessing for the people of Muara Enim, "said Arviyan Arifin.
Regent (Bupati) Muara Enim, Ir. H. Muzakir Sai Sohar said Bukit Asam Tirta Enim Swimming Pool is a support from PTBA for numerous times for the community of Muara Enim and will be an asset for the local government. "The presence of this pool has been very eagerly awaited. We were really pleased. Withrespects, all levels of the Government of Muara Enim, we thank you once again to PTBA", said Muzakir Sai Sohar in front of the board of directors and management of PTBA, Muspida Muara Enim, and also to all invitations attend that afternoon. On that occasion, District Government Muara Enim officially announce for the swimming pool.
In the swimming pool complex covering an area of ??4,900 square meters, in addition there is also a swimming pool for children, also equipped with supporting facilities such as the tribunefor 900 people capacity, and VIP facilities for 50 people. To support the various game events and coaching athletes have also provided space office accommodation, which has the VIP lounge, classrooms for study, facility management room, meeting rooms, and a dressing room which is very representative for national-level competitions.
This building built with reinforced concrete construction and use of the stake. The building also has generators, balancing tanks for water circulation in the pool, access roads using the hot mix asphalt, street lamps using PJU (street lighting) of 120 units, a parking area that can accommodate 50 cars and 50 motorcycles, cooling room air conditioner that uses 18,000 BTHU 12 units, lighting using spotlights MHNT-D 2,000 watts, and the scoring board measuring 1.8 x 3 square meters. (PR PTBA)


